A recent customer called about a bathroom fitting in Clifford Chambers, CV37. We discussed their ideas and gave them some of our own. We booked it in for the following week. 

First, we gutted the bathroom out, ready to prepare the walls. We tiled the area behind the sink and the toilet with the ones that they chose. Then, we fitted their bath, toilet and sink. This was a lot of plumbing work and took the most time out of the whole process. We sealed around the bath with sealing strips. We put the bath tiles on the wall on top of the sealing strip so that any water hitting the tiles will run straight down onto the seal and into the bath. 

After the tiles were laid, we moved onto the floor. They wanted Lino around the toilet and sink. We covered everything in a silicone sealer to ensure everything was well protected. 

They were happy with their new bathroom. The whole project took 3 weeks.